Bannister Center

Bannister Center for Rehabilitation and Health Care

135 Dodge Street
Providence, RI

ICI brought an abandoned, unused, run down 4th floor space of the nursing home back to life. We demolished the existing floor coverings, wall coverings and all existing electrical and plumbing fixtures. We skimmed and painted all walls with a fresh set of paint and FRP, installed new flooring, new doors and hardware. We re-wired the entire floor and installed new electrical fixtures. In each of the units we installed new toilets and vanity/sinks/faucets. In the community shower we replaced and added all new plumbing fixtures. We installed a new custom millwork piece for the nursing station. The finishing touch was the FF&E the we assembled and installed for both resident units as well as common area.